Required Skills: Functional o9 lead, Postponement, MEIO,
Job Description
Functional o9 lead to build the additional scope of work on Postponement and MEIO.
The o9 postponement go-live requires hypercare through 9/30, but with full SKU ramp targeting the same date and GTK only testable from 9/6, we anticipate needing support beyond the standard 1-month window to ensure stable OK2USE by 9/30.
MEIO design is planned to kick off in H2 as an EP COE-led, business-critical initiative — it needs dedicated AM bandwidth that cannot be pulled from active hypercare.
Running both workstreams concurrently with current staffing creates unacceptable risk to either production stability or MEIO timelines.